Released Documents

Number Title Version Date
N/A Implementing Arrangement Between The Department of Energy and The National Aeronautics and Space Administration Regarding The Alpha Magnetic Spectrometer In Space Program 9/20/1995
N/A Implementing Arrangement Between The Department of Energy and The National Aeronautics and Space Administration Regarding The Alpha Magnetic Spectrometer In Space Program 9/20/1995
ESCG 4295-09-0011 Tool Control Plan 11/03/2009
N/A AMS-02 Hurricane Planning Addendum 08/02/2010
N/A Document Change Request - AMS Launch Site Support Plan (KPL-LSSP-21507) 03/19/2010
KPL-LSSP-21507 Space Station Assembly Flight (ISS-134) Utilization and Logistics Flight 6 Alpha Magnetic Spectrometer AMS-02 Rev A 08/01/2010
N/A AMS-01 Thermal Vacuum Test Specification 03/11/2010
ESCG-4390-08-SP-TP-0026 Electromagnetic Interference Test Plan for the Alpha Magnetic Spectrometer-02 (AMS-02) Rev F 02/2010
ESCG-8400-AMS-10-AMS-PR-0001 Electromagnetic Interference Test Procedures for the AMS-02 Signature Pages Basic 02/2010
ESCG-4005-05-AMS-0039 Strength and Stability Assessment of the Alpha Magnetic Spectrometer-02 (AMS-02) Unique Support Structure (USS-02), Vacuum Case, Payload Attach System (PAS), and STS and ISS Integration Hardware 07/2009
AMS IA NASA/DOE AMS Implementing Arrangement (IA) - Signature copy 01/15/2010
ICD-A-21507 Shuttle Orbiter / AMS-02 Cargo Element Interface ICD (ICD-A-21507-AMS-02) Basic 06/2009
N/A AMS-02 JSC POCC Test Report 04/2009
N/A AMS-02 JSC POCC Test Report - Command 1 04/2009
N/A AMS-02 JSC POCC Test Report - Command 2 04/2009
ESCG-4390-09 AMS-02 COPV Damage Control Plan 01/2009
EA3-09-030 AMS-02 Burst Disk Vent Duct Report 11/17/2009
D684-13036-01 EVA Analysis Report: AMS to S3 Contingency CAS Release Rev A 09/2008
D684-13037-01 EVA Analysis Report: AMS PPAS and S3 PAS UMA Rev A 11/2008
D684-13038-01 EVA Analysis Report: S3 Secondary Translation Path With AMS Installed Rev A 11/2008
N/AAMS TVT setting-up at ESTEC Test facility 103/2009
ATS-1225 AMS-02 Task Sheet (ATS)
ATS-1225 TIPS General rules for ATS (Non NASA TPS Form)
CTSD-SH-1782 Mulit-Layer Insulation for the Alpha Magnetic Spectrometer Guidelines B 02/2009
DOC-0216 Pre-test Analysis for the AMS-02 Vacuum Case Sine Sweep Test - Part 1 Baseline 11/2006
DOC-0216 Pre-test Analysis for the AMS-02 Vacuum Case Sine Sweep Test - Part 2 Baseline 11/2006
JSC-27296 Project Plan for the AMS J 09/23/2009
JSC-27542 Alpha Magnetic Spectrometer Configuration Management Plan B 07/2006
JSC-28792 AMS-02 Structural Verification Plan for the Space Transportation System and the International Space Station G 07/22/2010
JSC-29095 Experiment/Payload Integration Hardware Interfaces - Part I Baseline 06/2002
JSC-29095 Experiment/Payload Integration Hardware Interfaces - Part II A 12/2004
JSC-29202 Experiment/Vacuum Case Payload Integration Hardware Interface D 02/2009
JSC-29779 Weld Certification Plan A 07/2002
JSC-29788 Master Verification Plan (MVP) Basic 02/10/2009
JSC-29789 PTRS for AMS-02 PIH A 08/2004
JSC-49978 A Phase II Flight Safety Data Package for the Alpha Magnetic Spectrometer-02 (AMS-02) A 03/2007
JSC-49978 D Phase III Flight Safety Data Package for the Alpha Magnetic Spectrometer-02 (AMS-02) D 04/18/2011
JSC-63123 Alpha Magnetic Spectrometer – 02 Assembly and Testing Integration Plan A 02/2009
JSC-63164 Quality Management Plan for the Alpha Magnetic Spectrometer-02 (AMS-02) Experiment Baseline 09/2005
JSC-64275 Phase II Ground Safety Data Package for the Alpha Magnetic Spectrometer-02 (AMS-02) and Ground Support Equipment 05/01/2008
JSC-65716 Phase III Ground Safety Data Package for the Alpha Magnetic Spectrometer-02 (AMS-02) and Ground Support Equipment 01/15/2010
JSC-65977 Radiation Test Report - AMS Hard Drives: 500GB Hitachi, 640GB Seagate and 750GB Western Digital 09/2010
N/A AMS-02 TRD Mock-Up MLI Tailoring and Cabling 11/2005
NT-AMS-001 AMS-02 Assembly and Integration Product Verification Rev A 09/01/2010
NSTS-21507 International Space Station-Utilization and Logistics Flight 6 05/2009
PRC Organizational PRC Index List : Structural Engineering Division
SSP57391 Alpha Magnetic Spectrometer (AMS-02) Software Interface Control Document 03/01/2008
TP-0206 Test Plan for the Static and Modal Tests of the AMS-02 Baseline 10/2006
TP-39138130 Optical Performance (Insertion Loss) Test Procedure – Cable 39138130 Baseline 07/17/12
TP-39138131 Optical Performance (Insertion Loss) Test Procedure – Cable 39138131 Baseline 07/17/12
TP-39137974 Burn-in Attachment AMS Laptop Hard Drive Burn-in Procedure Rev A 07/31/13
TP-39137974 Functional Attachment Laptop Hard Drive Functional Test Procedure 07/31/13
JSC-65944 DDRS Safety Data Package Rev A 09/07/2010
PIP-14-019 Payload Integration Agreement (PIA) for the Alpha Magnetric Spectrometer-02 (AMS-02) Payload   08/06/2014
JSC-66528 Phase I/II/III Flight Safety Data Package for the AMS-02 Multi-Insulation Layer Blanket   02/10/2014
SSP 57213 Alpha Magnetic Spectrometer-02 (AMS-02) Hardware Interface Control Document Rev B 05/2011


Acceptance Data Packages

AMS ADP data is stored in the AMS File Manager.  To access the ADP data please click the AMS File Manager link below and login.

AMS File Manager

ADP Plan Spreadsheet

View Completed ATS

* Some Magnet ADP data may require the use of the Solid Edge Viewer software which can be downloaded here.
Solid Edge Viewer v20  

MAGIK Assessments

(The documents listed below are only available from within the JSC network due to them being located on an internal server.)

Action Item Number Title Version Date
AI 2496 AMS Magnet Field Impacts to EVR Access   10/06/2010
AI 2483 AMS Permanent Magnet Field Impacts   07/15/2010
AI 2373 Impacts of AMS Magnetic Field for EVR Operations on ELC2   11/20/2009
AI 2279, Rev A AMS Installation   04/08/2008
AI 2172, Rev A AMS to ELC Berthing Clearances Rev A 02/27/2007
AI 2171, Rev B AMS Star Tracker Field of View Assessment Rev B 02/15/2007
AI 1965 AMS to Alternate CAS Sites   03/28/2005
AI 1825 AMS, EXP, & ICC Payload Bay Option for UF4.1   01/28/2004
AI 1808 Robotic Operations Near AMS 10 Gauss Magnetic Field   02/03/2004
AI 1705 AMS to EXP Clearances   05/12/2003
AI 1636 SPDM Exposure to AMS Magnet During S3 RPCM R&R   02/10/2003
AI 1608 Robotic Operations Near AMS Magnetic Fields   10/10/2002
AI 1471 Robotic Ops inside the AMS Magnetic Field   03/26/2002
AI 1451 SSRMS & SPDM Clearances to AMS   12/06/2001
AI 1321 AMS 6 Gauss Keep Out Zone   05/16/2001
AI 1254 AMS Configuration #5 Assessment   12/07/2000
AI 1192 AMS Configuration #4 Assessment   07/11/2000
AI 1174 AMS Configuration #3 Assessment   04/24/2000
AI 1146 Assess Alternate AMS Configuration - Impacts of AMS Orientation Changes   02/17/2000

Transportation and Logistics

(The documents listed below are only available from within the JSC network due to them being located on an internal server.)

Action Item Number Title Version Date
N/A November 9-11, 2009 - AMS Minutes R1 11/09/2009